GFL proudly operates Edmonton’s only construction and demolition waste Material Recovery Facility (MRF). This engineered facility is designed to separate inbound waste into recyclables, diverting tons of waste from our landfills. Of the total amount of material received at the MRF, we have a goal of diverting as much material as possible from landfill.

With a capacity to receive over 100,000 metric tons annually, GFL’s Edmonton MRF is helping to sort and recycle materials for use in the production of refuse-derived fuel, alternative feedstock, composting and ultimately introducing materials back into the global recycling stream to be remanufactured and used in research.

Construction and Demolition Waste

 

GFL understands the importance of recycling as a critical component to the sustainability of our resources and the wellbeing of our environment. Our Edmonton MRF is an example of these practices. Mixed loads of construction and demolition material are sorted, and we divert as much material as possible from landfill, sending some to recycle processors and some for beneficial reuse in other applications.

Have a large project with higher volumes of waste?

To find a solution for your C&D needs, contact us today.

What Materials Are Accepted?

 

We accept mixed or segregated loads of construction and demolition waste which includes:

  • Wood
  • Drywall or gypsum board
  • Metal
  • Asphalt
  • Concrete
  • Shingles
  • Cardboard
  • Green waste (tress / brush)

What is Not Accepted?

 

Hazardous waste is not accepted at our MRF. If required, please call for assistance on the safe disposal or recycling of these waste streams. We can help!

What are the Fees and Payment Options?

 

Mixed Construction and Demolition Material Fee: $110.00/ ton ($35.00 min)

Payment Options: Visa, Mastercard, AMEX, Interac or pre-approved 30-day credit